12/01/09 NOW OPEN IN OUR NEW LOCATION
|
|
• Above Left: New Large Cooking School
• Above Right: New Small Cooking School
• Right: View of New Store from Mall
• Below: Views from within the New Store |
|
|
|
|
|
|
|
11/18/09 Day two of moving. Getting everything moved in.
|
|
|
|
|
| The old store by the end of the day |
|
|
11/17/09 The move begins.
11/14/09 (34 hours after previous photos)
Floors have been completed.
|
|
|
 |

|
 |
 |
 |
Picture 1-6 Above - interior retail store
Pictures Left - small cooking school
Pictures below - large cooking school
|
 |
 |
|
11/13/09
Cabinetry and appliances being installed.
First Row:1-3. Front of Retail store
Second Row:1. Interior of store 2. Interior of store 3. front of large cooking school
Third Row: 1. Large cooking school 2. Large cooking school 3. Small cooking school
Fourth Row: 1. View of outdoor patio from the Mall atrium 2. Outdoor patio 3. Outdoor patio
11/04/09
Walls being painted and cabinetry being installed in the cooking schools and the retail store.
First Row: 1. Store front and main entrance to Kitchen Window's retail store. 2. Store front and Calhoun Square entry. 3. Inside of store - to right of main entrance.
Second Row: 1-3 Inside views of the retail store - cabinetry ready to be installed.
Third Row: 1. Main Cooking School - cabinetry being installed. 2. Small Cooking School - cabinetry being installed. 3. Outdoor patio - stone flooring being installed.
10/21/09
Sheet rock being installed in both of the cooking schools and the retail store.
9/29/09
Cooking School interior walls going up.
9/16/09
Brick installed on front face of building.
8/20/09
Front face of building installed.
08/09/09
Decking and floors installed. (Top row Kitchen Window's main floor retail store, bottom row - Cooking School's private outdoor kitchen and patio)
7/13/09
Steel and decking installed
6/26/09
Steel being installed
6/17/09
Steel being installed
6/11/09
The start of steel being installed
5/19/09
Exterior walls and footings
5/14/09
The exterior walls for Kitchen Window's new space start to go in.
12/18/08
The footings for Kitchen Window's new space start to go in and the parking ramp now has two additional floors.
12/03/08
The Border's building and the mall entrance are taken down.
Revised Mall Entrance (Kitchen Window will be located in the upper and lower level where "signage" appears)
Kitchen Window's New Location
10/13/2008
Demolition of existing buildings has begun.
Press Releases
9/25/08 - Kitchen Window among First Stores to Sign New Lease in Calhoun Square
Kitchen Window's - Relocation & Expansion
Fall 2009
If youve visited us recently, you know that construction is underway at Calhoun Square. Were looking forward to the changes in our future and wanted to give you a sneak preview of our new look.
Both the store and the cooking school will be moving to new, larger homes in Calhoun Squares former Borders location in 2009. Well gain substantial space in the store, giving us more room for exciting new products in an environment that will enhance your shopping experience. The cooking school is also growing, and in the new space well have three distinct venues for our cooking classes and private events: a large classroom, a more intimate classroom and a private outdoor classroom. But some things wont change well still have the best selection in town for cookware, cutlery, bakeware, small electrics, coffee and tea and more. Our knowledgeable staff will be here to serve you and help you choose the products that are right for you.The cooking school will continue to offer classes taught by some of the most well-known chefs in the Twin Cities, as well as our own Executive Chef and other engaging instructors. And not only will the space be new the school will be stocked with all new equipment, from the stove, dishwasher and refrigerator to the dishes, knives and wine glasses.
After almost 25 years in our current store location, and 10 years in our current cooking school, we are thrilled with the opportunity to update our space to reflect the pride that we take in serving you and bringing you the highest quality and widest variety of products available locally. We ask you to excuse the dust and other renovation issues as Calhoun Square and Kitchen Window gear up for the next 25 years. We know the end result will be worth it, and we cant wait to show you our new look.
Doug & Lia Huemoeller
Owners, Kitchen Window
The Calhoun Square Redevelopment Plan
The Calhoun Square redevelopment includes an additional two levels on the parking ramp, renovation of the mall's interior, creation of a pedestrian plaza on Girard Avenue, plus the addition of many new retail shops and services within Calhoun Square.All this newness and change is being accomplished while we are open and operating. The ramp has been converted to a Valet system while it is under construction, both for safety reasons as well as helping to maximize parking while under construction.Calhoun Square - we are so open and so worth the visit. Please visit www.calhounsquare.com for additional information on the renovation as well as tenant announcements and upcoming events.Redevelopment Drawings
|
Hennepin & Lake
Entrance |
|
Girard Avenue
Looking South
|
|
Girard Avenue
Looking North
|
|
|
Girard Avenue
Looking North |